IMPROVING PRODUCTIVITY IN THE CONSTRUCTION INDUSTRY THROUGH I-HUMAN RESOURCES DEVELOPMENT
TABLE CONTENTS
Approval web page
Dedication
Abstract
Acknowledgement
Table of content material
CHAPTER ONE
INTRODUCTION
1.1 Relevance of venture
1.2 Site inspection
1.3 Evolution of street community in nigeria
1.4 Motor car function that influences street layout information
1.5 Drivers and their traits
1.6 Reconnaissance survey
1.6.1Chain survey
1.6.2Station marking
1.7 Factors Affecting Choice Of Station
CHAPTER TWO
THEODOLITE TRANSVERSING OF THE ROAD CONTROL
2.1 Definitions
2.2 Thetheodolite
2.3 Theodorite adjustment
2.3.1Temporary adjustment
2.3.2Permanent adjustment
2.4 Procedure for theodolite traversing
2.5Materials used for the theodolte traversinging
CHAPTER THREE
PROJECT FIELD LEVELING WORK
3.1 Leveling
3.2 Profile leveling
3.3 Cross leveling
3.4 Objectives of leveling
3.5 Instruments utilized in leveling
3.6 Temporary adjustment of leveling device
3.7 Definition of a few leveling terminologies
3.8 Leveling ee-e book
3.9 Earthwork computation
3.9.1Method
CHAPTER FOUR
SOIL ANALYSIS
4.1 Collection and initial guidance of samples
4.2 Mechanical evaluation
4.3 Atterberg/consistency restriction assessments
4.3.1Liquid restriction take a look at
4.3.2Plastic restriction take a look at
4.4 Compaction take a look at
4.5 The California bearing ratio (cbr) take a look at
4.6 Pavement layout the usage of cbr
CHAPTER FIVE
GEOMETRIC ELEMENTS DESIGN
5.1 Basic layout parameters
5.1.1Design pace
5.1.2Gradient
5.1.3Sight distance
5.2 Curve layout
5.3 Curve parameters and formulation used, in designing of horizontal curves
5.4 Vertical curve layout
5.5 Cross sectional factors of the street
5.6 Brief description on degrees of labor and gadget used n street constriction
5.7 Summary and conclusion
Leave a Comment